Muzinq / De Popzaal


New construction of the pop hall in Almere. Work was carried out by Meetatelier (part of IGG Bouweconomie).

Projectinformation:

Functions: Leisure/Culture
Architect: Alsop Londen
Type of contract: NEN calculation
Assignment: Carrying out the NEN 2580 measurements, including providing insight into the total floor area of a building with challenging architecture and ditto shapes.