Programme requirements

A good design process starts with the preparation of a schedule of Rrequirements. The clearer the definition of  the requirements so an exact specification of the wishes of the client in a form presenting a clear overview can be constructed. Typically a good program of requirements would, for example decide on:

  • The quantitative requirements, this would includes the number of desks, workstations, clusters and the size requirements of each;
  • The inter-relationships of the various areas;
  • The technical requirements, these include among other consideration the climatic, interconnectivity, sound, lighting and so on;
  • The aesthetic requirements, this would include features, the design statement and the  the desired appearance of the building.

The clearer the definition so delays, remodelling, reworking etc. can all be kept to a minimum. IGG’s involvement in an early stage will help you get all spatial, functional and aesthetic qualities decided to prepare a complete and accurate Schedule of Requirements. IGG also assesses the program in its component constituents  with the financial framework set.

Would you be interested to see how our complete progamme requirement methods can assist you? Please contact IGG and our team of specialists at IGG as we have all necessary expertise at our fingertips.

 

IGG Bointon de Groot

Adres : Prinses Catharina Amaliastraat 32
2496 XD Den Haag
Post : Postbus 85767
2508 CL Den Haag
Tel : 070 514 54 20
Fax : 070 514 32 31
E-mail : info@igg.nl

Our partners

IGG Bointon de Groot is an active partner in the built environment. IGG follows
al trends and developments. Some of our important partners:

Partners